page_banner

products

Best IS200BICIH1A Suppliers - GE DS200TCEAG1B DS200TCEAG1BTF Emergency Over Speed Board – RuiMingSheng

short description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, trust the first and management the advanced" for IQS452 204-452-000-011 signal conditioner , Abb Tu830v1 3bse013234r1 , Abb Tc512v1 3bse018059r1 , We welcome all of the purchasers and pals to contact us for mutual added benefits. Hope to do additional business enterprise along with you.
Best IS200BICIH1A Suppliers - GE DS200TCEAG1B DS200TCEAG1BTF Emergency Over Speed Board – RuiMingSheng Detail:

Description

Manufacture GE
Model DS200TCEAG1B
Ordering information DS200TCEAG1BTF
Catalog Speedtronic Mark V
Description GE DS200TCEAG1B DS200TCEAG1BTF Emergency Over Speed Board
Origin United States (US)
HS Code 85389091
Dimension 16cm*16cm*12cm
Weight 0.8kg

Details

The DS200TCEAG1BTF GE Emergency Overspeed Board features one microprocessor and multiple programmable read only memory (PROM) modules and is located in the P core of the MKV panel. Its main purpose is to process the overspeed and flame detection trip signals from the turbine. If the circuit board is removed the berg jumpers must be reset. The board is designed with 3 fuses, 30 jumpers and 2 bayonet connectors. The PROM modules store the firmware and operating instructions used by the microprocessor. When replacing this board you will notice that there are no PROM modules on the replacement board. Since the PROM modules are easily removed and installed, you will find it is a simple task to move the modules from the defective board to the replacement. In addition, a benefit of using the same modules mean the user can expect the same functionality.

The DS200TCEAG1B GE Emergency Overspeed Board features one microprocessor and multiple programmable read only memory (PROM) modules and is located in the P core of the MKV panel. Its main purpose is to process the overspeed and flame detection trip signals from the turbine. If the circuit board is removed the berg jumpers must be reset. The board is designed with 3 fuses, 30 jumpers and 2 bayonet connectors.

The PROM modules store the firmware and operating instructions used by the microprocessor. When replacing this board you will notice that there are no PROM modules on the replacement board. Since the PROM modules are easily removed and installed, you will find it is a simple task to move the modules from the defective board to the replacement. In addition, a benefit of using the same modules mean the user can expect the same functionality.

The General Electric Emergency Overspeed Board model DS200TCEAG1B features one microprocessor and multiple programmable read only memory (PROM) modules. It also contains 3 fuses, 30 jumpers, and a pair of bayonet connectors. The board monitors the drive for over speed and flame detection trip conditions and shuts down the drive as appropriate. The bayonet connectors are used to connect the board to other devices and boards in the drive.

The male bayonet connectors on the end of the cables require some consideration before you connect them to the female connectors on the board. To remove a bayonet connector, hold the connector with one hand and with the other hand secure the board to keep it from bending or moving. Pull the bayonet connector out of the female connector on the board and put the cable aside until you are ready to connect it to the replacement board.


Datasheet link


Product detail pictures:

Best IS200BICIH1A Suppliers - GE DS200TCEAG1B DS200TCEAG1BTF Emergency Over Speed Board – RuiMingSheng detail pictures


Related Product Guide:

Innovation, excellent and reliability are the core values of our company. These principles today much more than ever form the basis of our success as an internationally active mid-size business for Best IS200BICIH1A Suppliers - GE DS200TCEAG1B DS200TCEAG1BTF Emergency Over Speed Board – RuiMingSheng , The product will supply to all over the world, such as: Luxembourg, Yemen, Hamburg, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
  • This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Madge from Berlin - 2018.07.26 16:51
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Abigail from Zurich - 2017.11.11 11:41

    Send your message to us: